Learn languages naturally with fresh, real content!

Popular Topics
Explore By Region
Telangana resumes 24/7 work on Srisailam canal tunnel project after safety survey, with new safeguards and faster approvals.
Telangana Irrigation Minister N Uttam Kumar Reddy has ordered the resumption of round-the-clock work on the Srisailam Left Bank Canal tunnel project, halted since a 2025 collapse, citing favorable results from an aerial electromagnetic survey.
The project will proceed with enhanced safety measures, including a dedicated division, independent oversight, and real-time geological monitoring.
Officials are urged to accelerate rehabilitation of key barrages and align testing with design work to meet phased approvals from the National Dam Safety Authority, with a review meeting scheduled after February 16.
3 Articles
Telangana reanuda el trabajo 24/7 en el proyecto del túnel del canal Srisailam después de la revisión de seguridad, con nuevas salvaguardas y aprobaciones más rápidas.