Learn languages naturally with fresh, real content!

Popular Topics
Explore By Region
Altris and Draslovka are building Europe’s first large-scale sodium-ion cathode plant in the Czech Republic, starting late 2026.
Altris and Draslovka have formed a partnership to build Europe’s first industrial-scale sodium-ion cathode material production line in Kolín, Czech Republic, with 19.3 million euros in in-kind investment.
The facility, converting an existing line, will produce up to 350 tons annually—enough for about 175 MWh of battery cells—starting in late 2026.
The project aims to create a fully integrated, Western-based supply chain, reducing Europe’s reliance on imported lithium materials and advancing sustainable, locally controlled battery production.
3 Articles
Altris y Draslovka están construyendo la primera planta catódica de iones de sodio a gran escala de Europa en la República Checa, a partir de finales de 2026.