Learn languages naturally with fresh, real content!

tap to translate recording

Explore By Region

flag Goldcliff achieves 88% gold recovery using eco-friendly non-cyanide process at British Columbia site.

flag Goldcliff Resource Corporation reports 88% gold recovery from metallurgical tests at its Panorama Ridge project in British Columbia using Dundee Sustainable Technologies’ non-cyanide CLEVR™ process. flag Initial results on drill core from the York zone showed a 0.74 g/t gold grade yielding 0.71 g/t post-treatment after thermal oxidation and one hour of leaching. flag The CLEVR process, designed as a closed-loop system with no effluent discharge, produces inert, non-acid-generating residues that meet safety thresholds, potentially eliminating the need for tailings ponds and reducing environmental risks. flag Dundee recommends further lab testing to optimize pre-treatment and recovery parameters. flag Goldcliff plans to continue its collaboration with Dundee to assess the process’s viability. flag Results are preliminary and not indicative of future performance.

11 Articles