Learn languages naturally with fresh, real content!

tap to translate recording

Explore By Region

flag Dateline Resources found high-grade gold at its California Colosseum project, with strong drill results supporting deep mining potential.

Dateline Resources reports significant gold discoveries at its Colosseum project in California, with drill results showing strong mineralization at depth, including 85.34 meters at 1.33 g/t gold and 61.26 meters at 1.18 g/t gold. A 32-hole, 4,257-meter drilling campaign strengthened the geological model and advanced the bankable feasibility study, supporting potential for a deeper open pit or underground development. The project holds 27.1 million tonnes at 1.26 g/t gold, totaling 1.1 million ounces, with a projected NPV of $550 million and IRR over 60% at $2,900 per ounce gold. The company is also exploring three gold breccia pipe targets and a rare earths anomaly near fenite dykes, with one site resembling the Mountain Pass mine. Additional assays are pending.

3 Articles

Further Reading