Learn languages naturally with fresh, real content!

Popular Topics
Explore By Region
Banyan Gold reports high-grade gold at Yukon’s AurMac Project, confirming ongoing mineralization and expanding drilling to 40,000 meters.
Banyan Gold Corp. reported high-grade gold intersections at its AurMac Project in the Yukon, including 1.90 g/t over 17.3 meters and 33.00 g/t over 0.8 meters, confirming continuity of mineralization in the Powerline Deposit.
Results from four drillholes support ongoing 3D modeling and suggest the deposit remains open down-dip and in other directions.
The company expanded its drilling program to 40,000 meters with a fourth rig following a $31.4 million investment from Alpayana, with over 30,000 meters drilled this year.
Visible gold and associated minerals were found in sheeted veins within brittle host rocks.
Analytical work by Bureau Veritas followed standard QA/QC protocols.
Banyan Gold informa de oro de alto grado en el Proyecto AurMac de Yukon, confirmando la mineralización en curso y la expansión de la perforación a 40,000 metros.