Learn languages naturally with fresh, real content!

Popular Topics
Explore By Region
Prince council approves $968,000 replacement for unsafe Gagnon Road bridge.
Prince council approved replacing the single-lane Gagnon Road bridge with a three-sided precast concrete structure costing $968,000.
This design, chosen for its 75-100 year lifespan and low maintenance, was the most expensive of five options by Tulloch Engineering Inc.
The new two-lane bridge will improve winter safety.
Funding comes from the Canada Community-Building Fund, Ontario Community Infrastructure Fund, and local reserves.
The 1930-built old bridge, with a 16,000-tonne weight limit, was deemed unsafe due to deterioration.
9 Articles
El consejo del Príncipe aprueba $968.000 de reemplazo para el peligroso puente Gagnon Road.