Marimaca Copper Corp. extends copper mineralization area to 700m by 400m near its Marimaca Oxide Deposit.

Marimaca Copper Corp. has extended copper mineralization at its Mercedes Target to cover an area 700m long and 400m wide through reverse circulation drilling. Eight holes were drilled, with six intersecting mineralization. This area is near the Marimaca Oxide Deposit, and the company plans to shift focus to the Sierra de Medina Project and Pampa Medina Deposit for further exploration.

November 26, 2024
3 Articles