San Diego crews start road resurfacing using slurry seal in select neighborhoods through August-September.
San Diego city crews start road repairs and resurfacing in Rancho Peñasquitos, Scripps Ranch, Torrey Highlands, Carmel Mountain Ranch, and Fairbanks Ranch using slurry seal, a cost-effective method to prevent street deterioration. The resurfacing will take place through August and September, with roads selected based on a pavement management system's Pavement Condition Index score. Residents can track progress on the city's StreetsSD map.
7 months ago
171 Articles
Articles
You have 4 free stories remaining this month. Subscribe anytime for unlimited access.