Learn languages naturally with fresh, real content!

Popular Topics
Explore By Region
3-week essential drainage maintenance work on Mitchell Highway west of Bathurst begins with lane closures and a 40 km/h speed limit.
3-week essential drainage maintenance work on a section of Mitchell Highway west of Bathurst begins with lane closures and a 40 km/h speed limit during weekdays 7am-5pm.
The work, carried out by Transport for NSW, follows reports of a crash hot spot on the highway, with 10 crashes in 2 years.
The NSW Government is upgrading sections of the Mitchell Highway between Bathurst and Orange, with plans for future work at two sites based on survey results.
10 Articles
Los trabajos esenciales de mantenimiento de drenaje de 3 semanas en Mitchell Highway al oeste de Bathurst comienzan con cierres de carriles y un límite de velocidad de 40 km/h.