KazTransOil transported over 800,000 tons of oil to Baku in Jan-July 2024, aiming to transport 1.5 million tons for the year via Aktau'

Kazakhstan's national oil pipeline operator, KazTransOil, transported over 800,000 tons of oil to Baku between Jan-July 2024, planning to transport 1.5 million tons for the year via Aktau's port to the Baku-Tbilisi-Ceyhan (BTC) pipeline. This follows Kazakhstan's President's 2022 directive to increase oil transportation through the Trans-Caspian corridor, leading to agreements with Azerbaijan's State Oil Company to transport up to 1.5 million tons annually from the Tengiz field via the BTC pipeline.

August 11, 2024
3 Articles