Infrastructure Malta plans to implement a €1.2-1.3M synchronized traffic light system by September in Tal-Barrani, Tarxien, and Bulebel, aimed at improving infrastructure and traffic flow.

Infrastructure Malta plans to implement a new traffic management system in the Tal-Barrani, Tarxien, and Bulebel area by the scholastic year, aiming to improve infrastructure and traffic flow. The project will address five key junctions and introduce a synchronized traffic light system, costing between €1.2M and €1.3M. The works will be finished by 23 September, improving direct connections between villages and reducing accidents.

July 01, 2024
3 Articles