33KV grid connectivity to Gurez, Jammu and Kashmir, restored after heavy snowfall disruptions.
Grid connectivity to Jammu and Kashmir's Gurez has been restored fully, after disruptions caused by heavy snowfall in the Razdan and Zadkhusi areas. The 33KV line has been charged up to Dawar Gurez, and the restoration effort involved retrieving a submerged line and replacing 15 damaged HT poles. The grid electricity supply to Gurez was previously provided through diesel generators during the disruption period.
11 months ago
3 Articles