CPC temporarily suspends Tengiz-Novorossiysk oil pipeline for maintenance work, 9-11 Apr 2024.

Caspian Pipeline Consortium (CPC) has temporarily suspended oil transshipment at the Tengiz-Novorossiysk oil pipeline from April 9 to 11, 2024, for scheduled maintenance work and installation of new equipment. Maintenance work includes connection of a new pipeline section, replacement of block valves, and defect elimination. These 72-hour shutdowns occur at least twice a year, with schedules agreed with shippers and the Kazakh Energy Ministry.

April 09, 2024
3 Articles