Egypt's Minister of Transportation inspects progress on Alexandria Metro Phase 1, a 21.7 km sustainable transport project.
Egypt's Minister of Transportation, Kamel El-Wazir, inspected progress on Alexandria Metro Phase 1, a key step towards a greener, sustainable transport network. The 21.7 km project, led by Orascom Construction & Colas Rail, features 20 stations & mix of elevated & surface-level tracks. Completed works include removing existing tracks & station buildings, soil testing, & 9 out of 13 level crossing paving.
April 06, 2024
3 Articles