Learn languages naturally with fresh, real content!

Popular Topics
Explore By Region
HS2's Chiltern Hills tunnel completion marks a milestone for London-Birmingham high-speed rail link.
HS2's first chapter of its longest tunnel under the Chiltern Hills completed with Cecilia's arrival.
The 2,000-tonne machine, joined by twin Florence, created twin-bore tunnels up to 80 metres deep, excavating three million cubic metres of chalk and installing 56,000 pre-cast concrete tunnel segments each.
The completion of this tunnel marks a significant milestone for the high-speed rail link between London and Birmingham, reducing trip times and alleviating traffic on the West Coast Mainline.
4 Articles
La finalización del túnel HS2 en Chiltern Hills marca un hito para el enlace ferroviario de alta velocidad Londres-Birmingham.