Dubai's RTA partners with Shamal Holding to build a 1,500-m bridge from Sheikh Zayed Road to Dubai Harbour, reducing travel time to 3 minutes.

Dubai's Roads and Transport Authority (RTA) has partnered with Shamal Holding to build a new bridge from Sheikh Zayed Road to Dubai Harbour. This 1,500-meter bridge, with two lanes in each direction, will reduce travel time to the seafront district from 12 minutes to just three. The bridge can accommodate 6,000 vehicles per hour and will serve as a direct entry/exit point for Dubai Harbour.

February 04, 2024
5 Articles