Green Line resumes service after shutdowns to repair tracks and remove 16 slow zones, improving reliability and smoother rides.

The Green Line, a vital transport route, was shut down multiple times throughout January 2024 for maintenance and repair work. The MBTA announced that these closures have now ended, with 16 speed restrictions removed and improvements made to the track infrastructure. This work aims to reduce unplanned service disruptions and provide a more reliable and smoother ride for passengers.

January 30, 2024
4 Articles

Further Reading